Existing anaerobic/aerobic pond system became overloaded, and in order to extend its life five floating aerators were installed at approximately one-third of the cost of additional ponds.

client:
Beit Bridge Council
LOCATION:
Beitbridge , Zimbabwe
Role:
Sole Consultants responsible for project management, design and supervision of the project.