The project entailed the design, supervision and construction of collector and major roads.u00a0 The works included but were not limited to design and construction of roads and Stormwater drainage system including, road line marking for about 19km of road.

client:
Shelter Zimbabwe
Contract Value
US$3.9 million
date:
2009
LOCATION:
Harare, Zimbabwe
Role:
Design and supervision of road pavement, road marking, earth works, storm-water and drainage works.