• Road widening on both sides of existing road by 4.5m wide.
  • Asphalt overlay on the existing junction.
  • Laying new 40mm thickness asphalt on new lanes
  • Constructing concrete berms.
  • Providing road markings.
  • Erecting new road signs
  • Landscaping and grassing

Project Hightlights

[40mm]

Asphalt Thickness

[4.5m]

Widening Width
client:
Unki Mine, Anglo American
Contract Value
US$500,000+
date:
2011
LOCATION:
Ngezi, Zimbabwe
Role:
Design and supervision of the project. Pavement Investigation.