BCHOD undertook Geotechnical investigations and report plus the rehabilitation of the the Cam and Motor TSF. The summary of works undertaken in the rehabilitation of the Cam and Motor TSF are as follows;
Access road construction
Tailings/slimes push back
Buttressing wall construction
Toe drain construction
Return and storm water ponds construction
Floating penstock and pipework construction
Top of dam and penstock access catwalk construction
Tailings disposal lines construction
Return water pipelines (HDPE) installation
Piezometers Installation
11.monitoring boreholes installation
Perimeter fencing
client:
RioZim
Contract Value:
US$3.5 million
Date:
2014 - 2015
LOCATION:
Zimbabwe
Role:
Contract Administration and Supervision of Works Contracts